Inpro Group
  • About us
  • PROJECTS
    • INSTALLATION TYPE
      • Critical Infrastructures
      • Gensets Supply
      • Heat production
      • Remote Monitoring System
    • INDUSTRIES
      • Data Centers
      • Hospitals
      • Airports and ports
      • Public Building
      • Shopping centers and hotels
      • Industry
    • Interactive Design Guide
  • PRODUCTS
    • Liquid fuel transfer
      • Oil Transfer Pressure Units
      • Oil Transfer Suction Units
      • Oil Transf. Ring System Pressure Units
      • Oil Transf. to Daily Tanks Pressure Units
      • Motorpumps
      • Filters and Fuel Polishing Systems
      • Oil Handling Installation Equipment: Regulation, Leak Detection, and Control
    • Monitoring and control
      • Tank Level Monitoring and Control
      • Wireless
    • Gas detection
      • Gas detection systems
      • Solenoid valves for gas
    • Flow meters for liquids
      • Mechanical
      • Electronic
      • Energy
      • Chemical
    • Inpro connected
      • nbIoT Smart Solutions
    • HVO READY
    • After sales videos
  • DISTRIBUTORS
  • NEWS
    • Blog Articles
    • Data Center
    • Fuel Polishing Systems
    • Events and Trade Fairs
    • Trainings
    • HVO News
    • Genset News
    • Post Blackout
    • International Partnership
    • Corporate News
  • CUSTOMER SERVICE
    • For Distributors
    • For Installers
    • After sales videos
  • CONTACT
  • enen
    • eses
    • frfr
    • DEDE
    • enen
    • eses
    • frfr
    • DEDE
Select Page
Post Blackout Campaign: checking an installation after the power outage

Post Blackout Campaign: checking an installation after the power outage

by Liz Dimely | Jul 18, 2025 | Electricity blackout, Electricity blackout

Assessment of an installation after the power outage The recent electricity blackout in the Iberian Peninsula has shown that many critical installations were not correctly dimensioned or adapted to current needs. In sectors such as hospitals, we have detected that...
Airport Power Outage: What if the next one brings air traffic to a standstill?

Airport Power Outage: What if the next one brings air traffic to a standstill?

by Liz Dimely | Jul 9, 2025 | Critical Instalations, Electricity blackout

Electricity blackout: when an airport can’t be shut down When the power grid went down, air transport was one of the hardest hit sectors. However, thanks to well-designed back-up systems, some airports were able to continue operating their critical systems:...
Hospitals after the power blackout: What if the next one lasts longer?

Hospitals after the power blackout: What if the next one lasts longer?

by Liz Dimely | Jul 2, 2025 | Instalaciones criticas, Instalaciones criticas, Critical Instalations, Electricity blackout

The 28 April power outage in Spain, Portugal and the south of France revealed hidden vulnerabilities Power supply in hospitals is non-negotiable. During the last blackout, many operating theatres and critical units continued to operate thanks to emergency generators....
Is your data centre prepared for a power outage?

Is your data centre prepared for a power outage?

by Liz Dimely | Jun 20, 2025 | Electricity blackout, Data Center, Instalaciones criticas, Instalaciones criticas, Critical Instalations

Recent power outage in Spain leaves key lessons for data centres The massive blackout that affected a large part of the Iberian Peninsula demonstrated the importance of truly reliable back-up systems. Many data centres continued to operate thanks to uninterruptible...
Spain’s electricity blackout: how hospitals, airports and data centres continued to operate thanks to INPRO

Spain’s electricity blackout: how hospitals, airports and data centres continued to operate thanks to INPRO

by Liz Dimely | Apr 29, 2025 | Data Center, Critical Instalations, Electricity blackout

Electricity blackout in Spain: how hospitals, airports and data centres continued to operate thanks to Inpro Group equipment On 28 April, a massive blackout left the entire Iberian Peninsula without electricity, affecting millions of people and key infrastructure in...

Entradas recientes

  • Post Blackout Campaign: checking an installation after the power outage
  • Airport Power Outage: What if the next one brings air traffic to a standstill?
  • Hospitals after the power blackout: What if the next one lasts longer?
  • Is your data centre prepared for a power outage?
  • Data Centre World Frankfurt 2025: We foster new connections

Comentarios recientes

No comments to show.

Archivos

  • July 2025
  • June 2025
  • May 2025
  • April 2025
  • March 2025
  • January 2025
  • December 2024
  • November 2024
  • October 2024
  • September 2024
  • July 2024
  • June 2024
  • May 2024
  • April 2024
  • March 2024
  • February 2024
  • January 2024
  • December 2023
  • November 2023
  • October 2023
  • September 2023
  • August 2023
  • July 2023
  • June 2023
  • May 2023
  • April 2023
  • November 2022
  • September 2022
  • July 2022
  • May 2022
  • April 2022
  • March 2022
  • February 2022
  • February 2020
  • August 2018
  • March 2018
  • February 2018
  • November 2016
  • February 2016
  • March 2015

Categorías

  • Corporativo
  • Grupos Electrógenos
  • Genset
  • Critical Instalations
  • Fuel Polishing System
  • training
  • Uncategorized
  • partnership
  • Data Center
  • corporate
  • Ferias
  • Product
  • Events and Fairs
  • Special Projects
  • Formacion
  • Electricity blackout
  • Centro Datos
  • HVO_en
  • Instalaciones criticas
  • Producto
  • Eventos y ferias

    Would you like to subscribe our newsletter?

    Privacy policy

    General conditions of sale 

    • Follow
    • Follow
    (c) Inpro Group. 2025