Inpro Group
  • About us
  • PROJECTS
    • INSTALLATION TYPE
      • Critical Infrastructures
      • Gensets Supply
      • Heat production
      • Remote Monitoring System
    • INDUSTRIES
      • Data Centers
      • Hospitals
      • Airports and ports
      • Public Building
      • Shopping centers and hotels
      • Industry
    • Interactive Design Guide
  • PRODUCTS
    • Liquid fuel transfer
      • Oil Transfer Pressure Units
      • Oil Transfer Suction Units
      • Oil Transf. Ring System Pressure Units
      • Oil Transf. to Daily Tanks Pressure Units
      • Motorpumps
      • Filters and Fuel Polishing Systems
      • Oil Handling Installation Equipment: Regulation, Leak Detection, and Control
    • Monitoring and control
      • Tank Level Monitoring and Control
      • Wireless
    • Gas detection
      • Gas detection systems
      • Solenoid valves for gas
    • Flow meters for liquids
      • Mechanical
      • Electronic
      • Energy
      • Chemical
    • Inpro connected
      • nbIoT Smart Solutions
    • HVO READY
    • After sales videos
  • DISTRIBUTORS
  • NEWS
    • Blog Articles
    • Data Center
    • Fuel Polishing Systems
    • Events and Trade Fairs
    • Trainings
    • HVO News
    • Genset News
    • International Partnership
    • Corporate News
  • CUSTOMER SERVICE
    • For Distributors
    • For Installers
    • After sales videos
  • CONTACT
  • enen
    • eses
    • frfr
    • DEDE
    • enen
    • eses
    • frfr
    • DEDE
Select Page

Electrical Blackout

After the recent power outage on the Iberian Peninsula, hospitals, airports and data centres continued to operate thanks to Inpro equipment.

Hospitals after the power blackout: What if the next one lasts longer?

Hospitals after the power blackout: What if the next one lasts longer?

Jul 2, 2025 | Critical Instalations, Electricity blackout

Energy supply in hospitals is non-negotiable. During the last blackout, many operating theatres and critical units continued to operate thanks to generators.

read more
Is your data centre prepared for a power outage?

Is your data centre prepared for a power outage?

Jun 20, 2025 | Data Center, Critical Instalations, Electricity blackout

The massive blackout that affected much of the Iberian Peninsula demonstrated the importance of truly reliable back-up systems. Many data centres continued to operate thanks to uninterruptible power supply systems.

read more
Spain’s electricity blackout: how hospitals, airports and data centres continued to operate thanks to INPRO

Spain’s electricity blackout: how hospitals, airports and data centres continued to operate thanks to INPRO

Apr 29, 2025 | Electricity blackout, Data Center, Critical Instalations

On 28 April, a massive blackout left a large part of the Iberian Peninsula without electricity, affecting millions of people and key infrastructure in Spain and Portugal. However, many hospitals, airports and data centres continued to operate normally.

read more

    Would you like to subscribe our newsletter?

    Privacy policy

    General conditions of sale 

    • Follow
    • Follow
    (c) Inpro Group. 2025