{"id":14710,"date":"2022-02-21T12:26:25","date_gmt":"2022-02-21T12:26:25","guid":{"rendered":"https:\/\/www.inprogroup.net\/?post_type=proyecto&#038;p=14710"},"modified":"2024-01-16T09:52:26","modified_gmt":"2024-01-16T09:52:26","slug":"children-hospital-dublin","status":"publish","type":"proyecto","link":"https:\/\/www.inprord.com\/en\/projects\/children-hospital-dublin\/","title":{"rendered":"Children Hospital (Dublin)"},"content":{"rendered":"<h2><span style=\"color: #e95d0f;\">PROJECT REQUIREMENTS:<\/span><\/h2>\n<p><span style=\"font-weight: 400;\">The customer requested gas oil pumping to the daily service tanks of the emergency or normal operation power generator units.<\/span><\/p>\n<h3>Solution adopted by INPRO<\/h3>\n<p><span style=\"font-weight: 400;\">The complete installation consists of two different fuel supply systems for the burners and gensets, both controlled by a master PLC . The whole installation has two main storage tanks. Both the burner ring pipeline and the genset ring pipeline suck fuel from these two main storages. The burner\u2019s supply installation is composed of a double pump unit, and five burners with the corresponding inlet stabilizer. The genset\u2019s supply\u00a0 installation is composed of a double pump unit and five electric generators with their corresponding daily tanks with the safety devices and their return single pump units.<\/span><\/p>\n<p><span style=\"font-weight: 400;\">The master PLC control will be redundant with two separate PLC programmed to control all the installation. There will be two different communication lines for each PLC, one via Modbus and the other via TCP-IP as well: there will be 4 redundancy communication control channels.<\/span><\/p>\n<h2><span style=\"color: #e95d0f;\">EQUIPMENT<\/span><\/h2>\n<ul>\n<li style=\"font-weight: 400;\" aria-level=\"2\"><span style=\"font-weight: 400;\">Main tank control: <\/span><b>EDM-40<\/b><span style=\"font-weight: 400;\"> probe<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"2\"><span style=\"font-weight: 400;\">Leaks detection: <\/span><b>DDP-25<\/b><span style=\"font-weight: 400;\"> interstitial chamber detector<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"2\"><span style=\"font-weight: 400;\">Pump system:\u00a0 2 x duplex fuel pumps <\/span><b>RL 7 <\/b><span style=\"font-weight: 400;\">(5300 L\/h)<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"2\"><span style=\"font-weight: 400;\">5 x simplex fuel pump <\/span><b>FP 90<\/b><span style=\"font-weight: 400;\"> (900 L\/h)<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"2\"><span style=\"font-weight: 400;\">2 x fuel polishing systems <\/span><b>SAFA<\/b><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"2\"><span style=\"font-weight: 400;\">Solenoid valves: to control the filling process<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"2\"><span style=\"font-weight: 400;\">Pumpset\u00a0control\u00a0cabinets:\u00a0<\/span><b>Inpro\u00a0CAG+<\/b><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"2\"><span style=\"font-weight: 400;\">Collector tray with leak detector<\/span><\/li>\n<li style=\"font-weight: 400;\" aria-level=\"2\"><span style=\"font-weight: 400;\">Level switch: <\/span><b>SMMR<\/b><\/li>\n<\/ul>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-14714\" src=\"https:\/\/www.inprord.com\/wp-content\/uploads\/2022\/02\/Gas-oil-pumping.-Children-Hospital-Dublin-1-300x244.png\" alt=\"\" width=\"335\" height=\"273\" srcset=\"https:\/\/www.inprord.com\/wp-content\/uploads\/2022\/02\/Gas-oil-pumping.-Children-Hospital-Dublin-1-300x244.png 300w, https:\/\/www.inprord.com\/wp-content\/uploads\/2022\/02\/Gas-oil-pumping.-Children-Hospital-Dublin-1.png 747w\" sizes=\"(max-width: 335px) 100vw, 335px\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>PROJECT REQUIREMENTS: The customer requested gas oil pumping to the daily service tanks of the emergency or normal operation power generator units. Solution adopted by INPRO The complete installation consists of two different fuel supply systems for the burners and gensets, both controlled by a master PLC . The whole installation has two main storage [&hellip;]<\/p>\n","protected":false},"featured_media":14721,"menu_order":0,"template":"","meta":{"_acf_changed":false,"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":""},"area_proyectos":[229,330],"class_list":["post-14710","proyecto","type-proyecto","status-publish","has-post-thumbnail","hentry","area_proyectos-hospitals-healthcare","area_proyectos-gensets-supply"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.inprord.com\/en\/wp-json\/wp\/v2\/proyecto\/14710","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.inprord.com\/en\/wp-json\/wp\/v2\/proyecto"}],"about":[{"href":"https:\/\/www.inprord.com\/en\/wp-json\/wp\/v2\/types\/proyecto"}],"version-history":[{"count":1,"href":"https:\/\/www.inprord.com\/en\/wp-json\/wp\/v2\/proyecto\/14710\/revisions"}],"predecessor-version":[{"id":21910,"href":"https:\/\/www.inprord.com\/en\/wp-json\/wp\/v2\/proyecto\/14710\/revisions\/21910"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.inprord.com\/en\/wp-json\/wp\/v2\/media\/14721"}],"wp:attachment":[{"href":"https:\/\/www.inprord.com\/en\/wp-json\/wp\/v2\/media?parent=14710"}],"wp:term":[{"taxonomy":"area_proyectos","embeddable":true,"href":"https:\/\/www.inprord.com\/en\/wp-json\/wp\/v2\/area_proyectos?post=14710"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}