{"id":14781,"date":"2022-02-22T10:50:20","date_gmt":"2022-02-22T10:50:20","guid":{"rendered":"https:\/\/www.inprogroup.net\/?post_type=proyecto&#038;p=14781"},"modified":"2024-01-16T09:48:03","modified_gmt":"2024-01-16T09:48:03","slug":"huawei-cameroon","status":"publish","type":"proyecto","link":"https:\/\/www.inprord.com\/en\/projects\/huawei-cameroon\/","title":{"rendered":"Huawei (Cameroon)"},"content":{"rendered":"<h2><span style=\"color: #e95d0f;\">PROJECT REQUIREMENTS:<\/span><\/h2>\n<p>The following project was a big challenge, not only in terms of the\u00a0height at which the systems were located, but also in terms of the project requirements for fire\u00a0and overflow control in such a singular building, a unique facility.<\/p>\n<h3>Solution adopted by INPRO<\/h3>\n<p>It was necessary that the automation and control of the diesel supply needs be\u00a0done from the main tank to the daily tanks in each of the three generators located at different\u00a0levels.<\/p>\n<h2><span style=\"color: #e95d0f;\">EQUIPMENT<\/span><\/h2>\n<ul>\n<li>Main tank control: <b>EDM-40<\/b> probe with display<\/li>\n<li>Leaks detection: <b>DDP-25<\/b> interstitial chamber detector<\/li>\n<li>Pump system: Discharge Pump with bypass &amp; Motorized valves<\/li>\n<li>2 x fuel pump <b>FP 20 ZW <\/b><b>Atex<\/b><\/li>\n<li>2 x fuel polishing systems <b>SAFA<\/b><\/li>\n<li>Solenoid valves: control the filling process &amp; <b>Alarm<\/b><b> Kit<\/b><\/li>\n<li>PLC control system (<b>CAG+<\/b>)<\/li>\n<li>Collector tray with leak detector<\/li>\n<li>Level switches <b>SMMR-3<\/b> and Flow meter<\/li>\n<\/ul>\n<p><img loading=\"lazy\" decoding=\"async\" class=\"alignnone wp-image-14782\" src=\"https:\/\/www.inprord.com\/wp-content\/uploads\/2022\/02\/Huawei-Cameroon-1-253x300.png\" alt=\"\" width=\"284\" height=\"337\" srcset=\"https:\/\/www.inprord.com\/wp-content\/uploads\/2022\/02\/Huawei-Cameroon-1-253x300.png 253w, https:\/\/www.inprord.com\/wp-content\/uploads\/2022\/02\/Huawei-Cameroon-1-768x910.png 768w, https:\/\/www.inprord.com\/wp-content\/uploads\/2022\/02\/Huawei-Cameroon-1.png 838w\" sizes=\"(max-width: 284px) 100vw, 284px\" \/><\/p>\n","protected":false},"excerpt":{"rendered":"<p>PROJECT REQUIREMENTS: The following project was a big challenge, not only in terms of the\u00a0height at which the systems were located, but also in terms of the project requirements for fire\u00a0and overflow control in such a singular building, a unique facility. Solution adopted by INPRO It was necessary that the automation and control of the [&hellip;]<\/p>\n","protected":false},"featured_media":14785,"menu_order":0,"template":"","meta":{"_acf_changed":false,"_et_pb_use_builder":"","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":""},"area_proyectos":[227,330],"class_list":["post-14781","proyecto","type-proyecto","status-publish","has-post-thumbnail","hentry","area_proyectos-critical-infrastructures-utilities-i-e-data-processing-centers-or-financial-facilities","area_proyectos-gensets-supply"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.inprord.com\/en\/wp-json\/wp\/v2\/proyecto\/14781","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.inprord.com\/en\/wp-json\/wp\/v2\/proyecto"}],"about":[{"href":"https:\/\/www.inprord.com\/en\/wp-json\/wp\/v2\/types\/proyecto"}],"version-history":[{"count":1,"href":"https:\/\/www.inprord.com\/en\/wp-json\/wp\/v2\/proyecto\/14781\/revisions"}],"predecessor-version":[{"id":21908,"href":"https:\/\/www.inprord.com\/en\/wp-json\/wp\/v2\/proyecto\/14781\/revisions\/21908"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.inprord.com\/en\/wp-json\/wp\/v2\/media\/14785"}],"wp:attachment":[{"href":"https:\/\/www.inprord.com\/en\/wp-json\/wp\/v2\/media?parent=14781"}],"wp:term":[{"taxonomy":"area_proyectos","embeddable":true,"href":"https:\/\/www.inprord.com\/en\/wp-json\/wp\/v2\/area_proyectos?post=14781"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}