{"id":6887,"date":"2021-11-11T17:39:23","date_gmt":"2021-11-11T17:39:23","guid":{"rendered":"https:\/\/www.inprogroup.net\/proyecto\/telefonica-data-processing-center\/"},"modified":"2024-06-05T09:01:51","modified_gmt":"2024-06-05T09:01:51","slug":"telefonica-data-processing-center","status":"publish","type":"proyecto","link":"https:\/\/www.inprord.com\/en\/projects\/telefonica-data-processing-center\/","title":{"rendered":"Nabiax DATA Processing Center"},"content":{"rendered":"<p>[et_pb_section fb_built=&#8221;1&#8243; admin_label=&#8221;section&#8221; _builder_version=&#8221;4.16&#8243; global_colors_info=&#8221;{}&#8221;][et_pb_row admin_label=&#8221;row&#8221; _builder_version=&#8221;4.16&#8243; background_size=&#8221;initial&#8221; background_position=&#8221;top_left&#8221; background_repeat=&#8221;repeat&#8221; global_colors_info=&#8221;{}&#8221;][et_pb_column type=&#8221;4_4&#8243; _builder_version=&#8221;4.16&#8243; custom_padding=&#8221;|||&#8221; global_colors_info=&#8221;{}&#8221; custom_padding__hover=&#8221;|||&#8221;][et_pb_text admin_label=&#8221;Text&#8221; _builder_version=&#8221;4.21.0&#8243; background_size=&#8221;initial&#8221; background_position=&#8221;top_left&#8221; background_repeat=&#8221;repeat&#8221; global_colors_info=&#8221;{}&#8221;]<\/p>\n<h2 style=\"text-align: justify;\"><span style=\"color: #ff6600;\"><strong>Project Requirements<\/strong><\/span><\/h2>\n<p style=\"text-align: justify;\">The project consisted of automating and <strong>controlling the Gas Oil supply needs of 25 Emergency Power Generator Units<\/strong> from two main tanks, one for each line, and a reserve tank for the daily service tanks of each power generator unit.<\/p>\n<h2 style=\"text-align: justify;\"><strong><span style=\"color: #ff6600;\">Inpro Solution<\/span><\/strong><\/h2>\n<p style=\"text-align: justify;\"><strong>Two 80 m3 oil storage tanks were planned and installed<\/strong>, buried inside a concrete bund in the area stated in the installation plans with easy access for filling the bund. A 30 m3 gas oil storage tank was planned, meant to provide a reserve tank to supply the others.<\/p>\n<p style=\"text-align: justify;\"><strong>Pipe lines<\/strong> were selected according to the criteria of standard DIN 4755 indicating that gas oil speed in propulsion pipes must be between 1 and 1.5 m\/s and in suction pipes between 0.2 and 0.5m\/s. The adopted solution neutralizes the pressure in the line when the system is idle. Operation without pressure limits the possibility of spills, so a leak detection, containment and management system was installed in the entire facility, which allowed communication with the management system and a verification option. In the pump rooms, the collector trays of the<strong> pump systems<\/strong> are controlled with infrared sensors.<\/p>\n<p>[\/et_pb_text][\/et_pb_column][\/et_pb_row][et_pb_row column_structure=&#8221;1_3,1_3,1_3&#8243; _builder_version=&#8221;4.21.0&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221;][et_pb_column type=&#8221;1_3&#8243; _builder_version=&#8221;4.21.0&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221;][et_pb_image src=&#8221;https:\/\/www.inprord.com\/wp-content\/uploads\/2023\/07\/IMAGEN-1.png&#8221; title_text=&#8221;IMAGEN 1&#8243; show_in_lightbox=&#8221;on&#8221; _builder_version=&#8221;4.21.0&#8243; _module_preset=&#8221;default&#8221; custom_padding=&#8221;|27px||25px||&#8221; global_colors_info=&#8221;{}&#8221;][\/et_pb_image][\/et_pb_column][et_pb_column type=&#8221;1_3&#8243; _builder_version=&#8221;4.21.0&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221;][et_pb_image src=&#8221;https:\/\/www.inprord.com\/wp-content\/uploads\/2023\/07\/IMAGEN-2.png&#8221; title_text=&#8221;IMAGEN 2&#8243; show_in_lightbox=&#8221;on&#8221; _builder_version=&#8221;4.21.0&#8243; _module_preset=&#8221;default&#8221; width=&#8221;95.8%&#8221; custom_padding=&#8221;|14px||21px||&#8221; global_colors_info=&#8221;{}&#8221;][\/et_pb_image][\/et_pb_column][et_pb_column type=&#8221;1_3&#8243; _builder_version=&#8221;4.21.0&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221;][et_pb_image src=&#8221;https:\/\/www.inprord.com\/wp-content\/uploads\/2023\/07\/IMAGEN-51-1.png&#8221; title_text=&#8221;IMAGEN 51&#8243; show_in_lightbox=&#8221;on&#8221; _builder_version=&#8221;4.21.0&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221;][\/et_pb_image][\/et_pb_column][\/et_pb_row][et_pb_row admin_label=&#8221;row&#8221; _builder_version=&#8221;4.16&#8243; background_size=&#8221;initial&#8221; background_position=&#8221;top_left&#8221; background_repeat=&#8221;repeat&#8221; global_colors_info=&#8221;{}&#8221;][et_pb_column type=&#8221;4_4&#8243; _builder_version=&#8221;4.16&#8243; custom_padding=&#8221;|||&#8221; global_colors_info=&#8221;{}&#8221; custom_padding__hover=&#8221;|||&#8221;][et_pb_text admin_label=&#8221;Text&#8221; _builder_version=&#8221;4.21.0&#8243; background_size=&#8221;initial&#8221; background_position=&#8221;top_left&#8221; background_repeat=&#8221;repeat&#8221; global_colors_info=&#8221;{}&#8221;]<\/p>\n<p style=\"text-align: justify;\">We opted to place vacuum detectors with regenerative pump in the supply tank as well as in the main tanks, thus preventing false alarms. Controlling and installing a vacuum system is more effective than installing a pressure or fluid system. In conclusion, we chose to install a DDP-25 double-skinned detector according to standard EN 13160-1, Class 1.<\/p>\n<p style=\"text-align: justify;\">With this in mind, two pump systems were designed to supply sides A and B independently, consisting of: Two 4000 L\/f self-priming motor pumps, each with flow adjustment, double-filtering collector, safety valves, retention valves, pressure transducer and spillage collector tray with infrared detector.<\/p>\n<p>[\/et_pb_text][et_pb_text admin_label=&#8221;Text&#8221; _builder_version=&#8221;4.21.0&#8243; background_size=&#8221;initial&#8221; background_position=&#8221;top_left&#8221; background_repeat=&#8221;repeat&#8221; global_colors_info=&#8221;{}&#8221;]<\/p>\n<h2>\u00a0<strong><span style=\"color: #e95d0f;\">Equipment<\/span><\/strong><\/h2>\n<ul>\n<li><strong>Probe EDM40<\/strong><\/li>\n<li>Interstitial chamber detector DDP-25<\/li>\n<li>Oil pump system<strong>\u201cINPRO\u201d ATAM-GE<\/strong><\/li>\n<li>Collector tray with spillage detector<\/li>\n<li>Solenoid valves<\/li>\n<li>Level switch \u2013 <strong>SMMR<\/strong><\/li>\n<li><span data-contrast=\"auto\" xml:lang=\"ES-ES\" lang=\"ES-ES\" class=\"TextRun SCXW136499984 BCX0\"><span class=\"NormalTextRun SCXW136499984 BCX0\">Meter<\/span><\/span><span class=\"EOP SCXW136499984 BCX0\" data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/li>\n<li><span data-contrast=\"auto\" xml:lang=\"ES-ES\" lang=\"ES-ES\" class=\"TextRun SCXW204129823 BCX0\"><span class=\"NormalTextRun SpellingErrorV2Themed SCXW204129823 BCX0\">Pump<\/span><span class=\"NormalTextRun SCXW204129823 BCX0\"> <\/span><span class=\"NormalTextRun SpellingErrorV2Themed SCXW204129823 BCX0\">with<\/span><span class=\"NormalTextRun SCXW204129823 BCX0\"> <\/span><span class=\"NormalTextRun SpellingErrorV2Themed SCXW204129823 BCX0\">retention<\/span><span class=\"NormalTextRun SCXW204129823 BCX0\"> <\/span><span class=\"NormalTextRun SpellingErrorV2Themed SCXW204129823 BCX0\">valve<\/span><\/span><span class=\"EOP SCXW204129823 BCX0\" data-ccp-props=\"{&quot;201341983&quot;:0,&quot;335551550&quot;:6,&quot;335551620&quot;:6,&quot;335559739&quot;:160,&quot;335559740&quot;:259}\">\u00a0<\/span><\/li>\n<\/ul>\n<p>[\/et_pb_text][\/et_pb_column][\/et_pb_row][et_pb_row column_structure=&#8221;1_3,1_3,1_3&#8243; _builder_version=&#8221;4.21.0&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221;][et_pb_column type=&#8221;1_3&#8243; _builder_version=&#8221;4.21.0&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221;][et_pb_image src=&#8221;https:\/\/www.inprord.com\/wp-content\/uploads\/2023\/07\/IMAGEN-4.png&#8221; title_text=&#8221;IMAGEN 4&#8243; show_in_lightbox=&#8221;on&#8221; _builder_version=&#8221;4.21.0&#8243; _module_preset=&#8221;default&#8221; custom_padding=&#8221;|12px||7px||&#8221; global_colors_info=&#8221;{}&#8221;][\/et_pb_image][\/et_pb_column][et_pb_column type=&#8221;1_3&#8243; _builder_version=&#8221;4.21.0&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221;][et_pb_image src=&#8221;https:\/\/www.inprord.com\/wp-content\/uploads\/2023\/07\/IMAGEN-6-1.png&#8221; title_text=&#8221;IMAGEN 6&#8243; show_in_lightbox=&#8221;on&#8221; _builder_version=&#8221;4.21.0&#8243; _module_preset=&#8221;default&#8221; custom_padding=&#8221;|12px||13px||&#8221; global_colors_info=&#8221;{}&#8221;][\/et_pb_image][\/et_pb_column][et_pb_column type=&#8221;1_3&#8243; _builder_version=&#8221;4.21.0&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221;][et_pb_image src=&#8221;https:\/\/www.inprord.com\/wp-content\/uploads\/2023\/07\/IMAGEN-31.png&#8221; title_text=&#8221;IMAGEN 31&#8243; show_in_lightbox=&#8221;on&#8221; _builder_version=&#8221;4.21.0&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221;][\/et_pb_image][\/et_pb_column][\/et_pb_row][et_pb_row _builder_version=&#8221;4.21.0&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221;][et_pb_column type=&#8221;4_4&#8243; _builder_version=&#8221;4.21.0&#8243; _module_preset=&#8221;default&#8221; global_colors_info=&#8221;{}&#8221;][et_pb_image src=&#8221;https:\/\/www.inprord.com\/wp-content\/uploads\/2023\/07\/DIAGRAMA-TELEFONICA.png&#8221; title_text=&#8221;DIAGRAMA TELEFONICA&#8221; show_in_lightbox=&#8221;on&#8221; _builder_version=&#8221;4.21.0&#8243; _module_preset=&#8221;default&#8221; border_width_all=&#8221;1px&#8221; border_color_all=&#8221;#000000&#8243; global_colors_info=&#8221;{}&#8221;][\/et_pb_image][\/et_pb_column][\/et_pb_row][\/et_pb_section]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Project Requirements The project consisted of automating and controlling the Gas Oil supply needs of 25 Emergency Power Generator Units from two main tanks, one for each line, and a reserve tank for the daily service tanks of each power generator unit. Inpro Solution Two 80 m3 oil storage tanks were planned and installed, buried [&hellip;]<\/p>\n","protected":false},"featured_media":6888,"menu_order":0,"template":"","meta":{"_acf_changed":false,"_et_pb_use_builder":"on","_et_pb_old_content":"","_et_gb_content_width":"","footnotes":""},"area_proyectos":[227,330],"class_list":["post-6887","proyecto","type-proyecto","status-publish","has-post-thumbnail","hentry","area_proyectos-critical-infrastructures-utilities-i-e-data-processing-centers-or-financial-facilities","area_proyectos-gensets-supply"],"acf":[],"_links":{"self":[{"href":"https:\/\/www.inprord.com\/en\/wp-json\/wp\/v2\/proyecto\/6887","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.inprord.com\/en\/wp-json\/wp\/v2\/proyecto"}],"about":[{"href":"https:\/\/www.inprord.com\/en\/wp-json\/wp\/v2\/types\/proyecto"}],"version-history":[{"count":2,"href":"https:\/\/www.inprord.com\/en\/wp-json\/wp\/v2\/proyecto\/6887\/revisions"}],"predecessor-version":[{"id":26117,"href":"https:\/\/www.inprord.com\/en\/wp-json\/wp\/v2\/proyecto\/6887\/revisions\/26117"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.inprord.com\/en\/wp-json\/wp\/v2\/media\/6888"}],"wp:attachment":[{"href":"https:\/\/www.inprord.com\/en\/wp-json\/wp\/v2\/media?parent=6887"}],"wp:term":[{"taxonomy":"area_proyectos","embeddable":true,"href":"https:\/\/www.inprord.com\/en\/wp-json\/wp\/v2\/area_proyectos?post=6887"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}