by inproadmin | Feb 22, 2022
PROJECT REQUIREMENTS: The main difficulties were to overcome height difference about 600m from the daily surface tanks to the main tanks installed inside the mine; and achieve ATEX certification. Solution adopted by INPRO Carefully select and separate in design phase...
by traspaso_proyectos_en | Nov 11, 2021
To supply the burners, two double-pump, automatically alternating pressure units are assembled. They are able to suction from either main tank, according to the gas oil level available in each of them. The main condition and precaution to be taken into account when...