Abu Rawash Wastewater Treatment Plant (Egypt)

Project Requirements:

The client requested a fuel system package to carry out effective monitoring and control from 2 fuel storage tanks to backup power generators, providing communication with a central BMS management system.

Inpro Solution:

An anti-siphon motorized valve, a double pump ring-type (RL) transfer skid, control of twelve daily tanks with their respective safety systems, including a return pump, and two fuel meters to monitor and record the amount of diesel sent to the generators.
All the equipment is controlled by a single PLC, which collects instrumentation signals from the daily tank area through a second CAG+ panel.

Equipment:

  • Main tank control: EDM-40 probe
  • Leak detection: OWU for Oil and Water
  • Pump system:
    • 1 x double group RL 9 GE 10,500 l/h
    • 1 x SAFA preventive fuel filtration system
    • 1 x CAG+ fuel transfer panel control system
    • 1 x CAG+ fuel monitoring panel for 12 daily tanks
  • SMMR level switches with overfill protection
  • Flow meter with MGI 250 pulse emitter
  • Iron 50 return pumps

Want to know more details about this project?

If you belong to the engineering, construction or project consultancy sector and you want to know more information about this project and many others about hospitals, airports, data centers, shopping centers, etc… you can download our project dossier here.

    Diesel supply for Backup Critical Facilities

    We are specialized in the design and manufacture automatic fuel, pumping systems for critical backup installations, and industrial and commercial heat production.

    We develop engineering bespoke solutions for automatic supply of boilers and power generation plants in:

    • Hospitals
    • Data centers
    • Airports
    • Office buildings
    • Residential buildings
    • Malls

     

    Another projects