We will be present at the Data Centre World Paris 2025, sharing a stand with our French partner Rotaconnect
On 5 and 6 November 2025, we will once again be exhibiting at Data Centre World Paris, the leading event for professionals and specialists in the Data Centre sector in France and Europe.
Containerized Energy Supply Package – Integrated Solution for Transfer, Control, and Polishing Systems in Data Centres
Integral Containerised Solution for Fuel Transfer Equipment with Control Panel and Filtering Systems for Data Processing Centres (DPC).
HEATING CAMPAIGN 2025
When temperatures drop, the need for reliable heating systems becomes a priority in homes, residences, hotels, hospitals and offices.
Supermarkets after the electricity blackout: are they prepared for the next crisis?
The electricity blackout that paralysed a large part of Spain and the Iberian Peninsula brought supermarkets face to face with a harsh reality: the vulnerability of the cold chain.
Post Blackout Campaign: checking an installation after the power outage
The recent electricity blackout in the Iberian Peninsula has shown that many critical installations were not correctly dimensioned or adapted to current needs.
Airport Power Outage: What if the next one brings air traffic to a standstill?
When the power grid went down, air transport was one of the hardest hit sectors. However, thanks to well-designed back-up systems, some airports were able to continue operating their critical systems.
Hospitals after the power blackout: What if the next one lasts longer?
Energy supply in hospitals is non-negotiable. During the last blackout, many operating theatres and critical units continued to operate thanks to generators.
Is your data centre prepared for a power outage?
The massive blackout that affected much of the Iberian Peninsula demonstrated the importance of truly reliable back-up systems. Many data centres continued to operate thanks to uninterruptible power supply systems.
Data Centre World Frankfurt 2025: We foster new connections
On 4 and 5 June, together with our German brand Simka, we participated as exhibitors at the Data Centre World Frankfurt 2025, the leading event in the data centre sector in Germany.
Submersible Pumps or Pressure Units for Data Centres?
In a data centre, where power availability must be absolute, every component of the backup system must respond with total reliability. When it comes to powering emergency generators with diesel or HVO, the choice of transfer system (such as booster sets) makes all the difference.